It's been about a week since my last post (my last confession?) and again, lots has happened. The floorboards were finally delivered, although later in the week than anticipated. The floorboards installer has sealed most of the concrete and has even installed a bit of the timber. The timber treads have been installed on the staircase and they look pretty good.
The feature deck at the front door has been installed and consists of timber from the old Busselton Jetty. It's beautiful old jarrah and is a real feature.
The tilers were in yesterday busily doing something - don't know. The electrician was there too and will install the lights upstairs this morning. I had to purchase the lights myself and have had them sitting in a spare room until last night when I had to deliver them.
It's interesting coming to the end of all this because I have started to notice things that should have been done. A few weeks ago I noticed that a gas point had not been installed in the living room, but now it has. This week I noticed that the render on the boundary walls had not been done (I thought they would do it when they rendered the garage) and that a tap has not been put in the front yard. Last night when I was delivering the lights I noticed that no provision had been made for a light at the top of the window near the landing of the stairs.
Here are the jarrah porch and some floorboards.